

1575 HARMONY KAREERAND RETURN WATER PIPELINES PROJECT
Mine Waste Solutions (Pty) Ltd – (The Applicant) plans to construct an additional 800mm diameter return water pipeline along the existing pipeline route from Kareerand Tailings Storage Facility (TSF) to Midway Dam to increase pumping rate of return water from Kareerand TSF to the reclamation pump stations. The infrastructure planned is an additional 11.1km return water pipeline. The water from Kareerand is the main source of water for the reclamation operations and the proposed pipeline will increase the volume of return water available for reclamation and processing at MWS plant.
Basic Assessment for Public Review (Click Here)
- Appendix A: Details and Experience of the EAP (Click Here)
- Appendix B: Public Participation (Click Here)
- Appendix C: Maps (Click Here)
- Appendix D: Specialist Reports (Click Here)
- Appendix E: Impact Assessment Table (Click Here)
- Appendix F: DFFE Screening Tool (Click Here)
- Appendix G: Site Sensitivity Verification Report (Click Here)
- Appendix H: EMPr (Click Here)
- Appendix I: Application form (Click Here)